| 43 |
2025 |
± 500 kV HVDC OHTL Tabuk & Aqaba Gulf (Portion-I) |
4400015370 |
Ground Assembly and Erection works |
NCC/SEC |
| 42 |
2025 |
NEOM Mountain Project of 380/132/33 KV BSP |
PO-AGC-0019122 |
Ground Assembly and Erection works of Frame Structure |
AL-GIHAZ Contracting /SEC |
| 41 |
2025 |
INTERTIE PROJECT BETWEEN AIN DAR SUB-30 380/115 KV AND ABQAIQ CENTRAL 230/115 KV BSPs |
4400018153 |
Tower Ground Assembly and Erection works |
AL Sharif Group/SEC |
| 40 |
2025 |
ASC/P#152/JAFURAH- STRG/CWLC/WO-01 |
4400017161 |
380kV Conductor and OPGW Stringing Works |
AL Sharif Group/SEC |
| 39 |
2025 |
Construction of 380kv OHTL associated with Reinforcement of Jeddah North Area |
4400016885 |
Tower Ground assembly and Erection works |
NCC/SEC |
| 38 |
2025 |
Interconnection of Al Hariq S/S 8742 with 132kV Network, In Hariq Area |
4400016628 |
Tower Ground assembly and Erection works |
AL Sharif KEC/SEC |
| 37 |
2024 |
Construction of 380kV OHTL NIC Circle BSP to Dhuba Green (Ckts. 1&2) |
4400015871 |
Tower Ground Assembly Tower Erection Tower Tightening Torqueing & Inspection Passing |
Al-Sharif Group & KEC Ltd. Co. |
| 36 |
2023 |
Construction of 230kV D/C OHTL between South Ghawar Plant Substation to Ghazal |
4400015959 |
Stringing |
ASC/SEC |
| 35 |
2023 |
Construction of 380kV D/C OHTL between Najran University BSP and Fara |
4400012764 |
Tower Erection |
ASC/SEC |
| 34 |
2022 |
Connection of Farsha 132/33kV S/S in Asir with Network (DC) |
4400012758 |
Stringing |
NCC/SEC |
| 33 |
2022 |
Connection of Farsha 132/33kV S/S in Asir with Network (DC) |
4400012758 |
Ground Assembly & Erection |
NCC/SEC |
| 32 |
2021 |
Construction of 110kV S/S for King Salman Specialized Hospital in Taif, of National Guard Health Affairs |
PCR-T/ 0005/17 |
Ground Assembly & Erection |
AlFanar/ NGsa |
| 31 |
2021 |
Raising of the Overhead Power Transmission Lines at Roads (T8 & T12) & Railway Crossings |
PIC P 7723 |
Access road & Str. Pad |
RC/NCC |
| 30 |
2021 |
Const. of 132kV D/C OHTL for Power supply to Baish West 132/13.8kV S/S |
4400012300 |
Stringing |
NCC/NGsa |
| 29 |
2021 |
Al-Fara (FRA) 380/132/13.8kV BSP |
– |
Assembly & Erection |
Al-Gihaz/NGsa |
| 28 |
2020 |
Juas 380/110/13.8kV BSP site at Asfan – Jeddah University |
– |
Assembly & Erection |
Al-Gihaz/NGsa |
| 27 |
2020 |
Replacement of old OPGW with New in 115kV OHTL and Repair / Replacement of Line Hardware in 380kV OHTL |
7300015604 |
OPGW Retrofitting Works |
NCC/MARAFIQ |
| 26 |
2020 |
Construction of 132kV OHTL in Eastern area |
– |
Assembly & Erection |
AFAC/ASG |
| 25 |
2020 |
Power Supply to 110/33/13.8kV Modon- 2 S/S in Jeddah |
4400003573 |
Dismantling/Retrofitting Works |
NGsa/NCC |
| 24 |
2020 |
Construction of 380kV OHTL from JEC/JRP S/S to Abha East 380kV BSP |
4400005257 |
Tower Erection |
SEC/NCC |
| 23 |
2020 |
Construction of 380kV OHTL from JEC/JRP S/S to Abha East 380kV BSP |
4400005257 |
PAC Foundation |
SEC/NCC |
| 22 |
2020 |
Construction of 380kV OHTL for Hunain Project |
4400007916 |
Stringing Activities |
NGsa/ASG |
| 21 |
2019 |
Reconductoring of 132kV DC OHTL between Al-Jouf PP and Sakaka-A S/S in Al-Jouf Area |
4400007944 |
Dismantling / Stringing (During Shutdown) |
NGsa/L&T |
| 20 |
2019 |
Mahad Al Dahab OHTL Project |
– |
Stringing |
FMDE/SEC |
| 19 |
2019 |
Connection work of new Sakaka PV with 132kV in Al Jouf Area |
– |
Ground Assembly & Erection Works |
SEC/UNISIS |
| 18 |
2019 |
Dismantling, Removal of old Porcelain Insulators Angle Towers-6 Nos., Suspension Towers -14 Nos., Gantry 2 Nos., Line No.08 & 09, and installation of new polymers Insulators |
– |
Dismantling and Installation of Insulators along with Hardware in 380kV Line |
GSC/MARAFIQ |
| 17 |
2018 |
132kV OHTL Gregar Project |
3448 |
Pad & Chimney Foundation |
NGsa/AlGihaz |
| 16 |
2018 |
On Call Service Contract for the Repair of 380kV & 115kV Transmission Line and Related Telecom System |
7300015604 |
OPGW Retrofitting Works – 6.5km |
Marafiq/NCC |
| 15 |
2017 |
Integration Of Shuqaiq-2 Power Plant 380kV OHTL |
4400003981 |
Stringing Works |
SEC/NCC |
| 14 |
2017 |
Reconductoring of 132kV D/C OHTL between Namera 132/33kV S/S and Biljurish 132/33kV S/S |
4400006414 |
GZTACSR & KTACSR |
SEC/NCC |
| 13 |
2017 |
Reconductoring of 132kV D/C OHTL from Banisar 132/13.8kV S/S to Atawlah 132/13.8kV S/S |
4400001834 |
Shifting Dismantling Materials |
SEC/NCC |
| 12 |
2017 |
Installation of 132kV D/C OHTL for the Power Supply to Qunfudah North 132/13.8kV S/S |
4400001836 |
Shifting Conductor Drums |
SEC/NCC |
| 11 |
2017 |
Construction of 380kV OHTL from JEC/JRP S/S to Abha East 380kV BSP |
4400005257 |
Stringing Works during Outage |
SEC/NCC |
| 10 |
2017 |
Construction of 380kV OHTL from JEC/JRP S/S to Abha East 380kV BSP |
4400005257 |
Stringing Works during Outage |
SEC/NCC |
| 9 |
2017 |
Connection of Sabya West (Al Dabiyah) 132/33kV S/S in Jizan with Network |
4400006413 |
Stringing Works |
SEC/Al SharifKEC |
| 8 |
2017 |
Connection of Bareq 132/33kV S/S in Tihama with network |
4400005907 |
Ground Assembly & Erection Works |
SEC/Al SharifKEC |
| 7 |
2017 |
Installation of 132kV D/C U/G Cable from Jizan CPS-1 to Jizan City Center S/S |
4400004559 |
Fiber Optic Cable Pulling |
SEC/NCC |
| 6 |
2017 |
Construction of 132kV D/C OHTL from Namerah 132kV S/S to Thoryban 132kV S/S |
4400004558 |
Shifting Conductor Drums |
SEC/NCC |
| 5 |
2017 |
Connection for Al-Arida 132/33kV S/S in Jazan with Network |
4400006412 |
Stringing Works |
SEC/KEC |
| 4 |
2017 |
Connection of Qalwah 132/33kV S/S in Tihama with Namerah North 380/132kV BSP |
4400005941 |
Stringing Works |
NGsa/NCC |
| 3 |
2016 |
132/33kV D/C OHTL – Tower Stringing work (From Al Arida to Jizan) |
4030131490 |
Stringing Works |
Hazza Al Husain Al Samdani Est. |
| 2 |
2016 |
380kV D/C OHTL Tower Conductor Stringing works (Rabigh) |
4030274451 |
Stringing Works |
SEC/NCC |
| 1 |
2016 |
380kV & 110kV D/C Tower Sagging, Dead Ending, Clipping, Jumpering & Conductor (Madinah) |
4400002926 |
Stringing Works |
SEC/SSEM |